02 / Step 4 — delivery
ANiX · BMI / OAI · NL
Step 4 — delivery
Commissioning and Delivery Report (RvO)
Complete functional testing, programming and formal delivery — with a delivery report per NEN 2654, ready for inspection and insurance.
After installation comes commissioning: every component is tested individually and as part of the integrated system, the control panel is programmed per the PoR and all outputs are validated. We deliver the Delivery Report (RvO) per NEN 2654.
What we do
- 01Functional test per detector and manual call point
- 02Test of every alarm output and control
- 03Control panel programming per PoR
- 04User training and key-holder handover
- 05Drafting of the Delivery Report (NEN 2654)
- 06Submission of the installation to the inspection body
What clients ask us first
01What is the Delivery Report (RvO)?
01 / 01The Delivery Report documents that the installation has been delivered in line with the PoR and engineering. It is a required document for inspection and is requested by insurers.
Related services
Discuss your situation with a specialist
Request a no-obligation intake. We are happy to think along about your installation, certification or maintenance work.
Request an intake call — AMSTERDAM
- info@anixfiresolutions.com
- PHONE
- +31 6 11 64 69 69
+31 6 36 29 64 33 - FOCUS
- BMI · OAI · NEN 2535 / 2654
- SCOPE
- NL · 09 SECTORS