ANiX Fire Solutions

11 / INSIGHTS

INSIGHTS

Technical notes on fire detection and evacuation

Engineering perspectives on the standards and sectors we work in — NEN 2535/2654, certification, and project realities.

  1. 01

    NEN 2654 maintenance of fire alarm systems — what is required and what we see in practice

    Periodic maintenance of a Dutch BMI is not optional; it is a legal duty. NEN 2654-1 in plain terms: frequency, responsibility, logbook, and the most common inspection failure points.

  2. 02

    Renewing the fire alarm inspection certificate — timeline, costs, and pitfalls

    A lapsed inspection certificate can take a Dutch building offline. How the renewal process works, which parties are involved, and what you can organise now to avoid losing time.

  3. 03

    Programme of Requirements (PoR) for fire alarm systems — what NEN 2535 expects

    The PoR is the blueprint for any Dutch BMI/OAI fire-detection project. What NEN 2535 requires, the components that matter most at inspection, and the pitfalls that delay certification.

  4. 04

    Fire safety in distribution centres: high-bay warehouses, pallet racking and aspiration detection

    A DC is not an office. Tall racks, dense air flows and high fire loads demand a fundamentally different detection strategy. What NPR 5310 and practice say.

  5. 05

    Fire safety in data centres: why point detectors fail in cold aisles, and what works

    High air velocities in cold-aisle containment defeat conventional smoke detection. Aspirating smoke detection (ASD/VESDA) per NEN-EN 54-20 is the standard — how it is engineered following NPR 5310.

  6. 06

    Evacuation alarm in a multi-tenant office complex: phased OAI under NEN 2575

    An evacuation alarm system for a building with multiple tenants needs a different schema than a single-tenant office. How to organise it per NEN 2575 without VVE conflicts.

  7. 07

    Fire safety in kindergartens: non-self-reliant children, sleeping rooms and staff-led evacuation

    A kindergarten does not evacuate itself. How a BMI/OAI is set up for childcare — with sleeping rooms, short evacuation times and a drilled protocol as the starting point.

  8. 08

    From Bouwbesluit to Bbl — what changes for your fire alarm system under the Dutch Environment Act

    With the entry into force of the Omgevingswet in 2024 the Dutch Bouwbesluit 2012 was replaced by the Besluit Bouwwerken Leefomgeving (Bbl). What stays the same for fire alarm systems, what shifts, and what you should watch.

  9. 09

    False alarms in fire detection systems — causes, costs, and how to reduce them

    A false alarm is not just disruption; it undermines trust in the system and can delay response to a real fire. The typical causes and how NEN 2535 addresses them.

  10. 10

    What does your insurer expect from your fire alarm system dossier?

    Insurers assess fire safety increasingly strictly. Which documents they expect, how they assess claims, and how to avoid a liability gap.

10Request an intake call

Discuss your situation with a specialist

Request a no-obligation intake. We are happy to think along about your installation, certification or maintenance work.

Request an intake callAMSTERDAM

EMAIL
info@anixfiresolutions.com
PHONE
+31 6 11 64 69 69
+31 6 36 29 64 33
FOCUS
BMI · OAI · NEN 2535 / 2654
SCOPE
NL · 09 SECTORS