- 018 May 2025
NEN 2654 maintenance of fire alarm systems — what is required and what we see in practice
Periodic maintenance of a Dutch BMI is not optional; it is a legal duty. NEN 2654-1 in plain terms: frequency, responsibility, logbook, and the most common inspection failure points.
- 0222 April 2025
Renewing the fire alarm inspection certificate — timeline, costs, and pitfalls
A lapsed inspection certificate can take a Dutch building offline. How the renewal process works, which parties are involved, and what you can organise now to avoid losing time.
- 0312 April 2025
Programme of Requirements (PoR) for fire alarm systems — what NEN 2535 expects
The PoR is the blueprint for any Dutch BMI/OAI fire-detection project. What NEN 2535 requires, the components that matter most at inspection, and the pitfalls that delay certification.
- 045 April 2025
Fire safety in distribution centres: high-bay warehouses, pallet racking and aspiration detection
A DC is not an office. Tall racks, dense air flows and high fire loads demand a fundamentally different detection strategy. What NPR 5310 and practice say.
- 0520 February 2025
Fire safety in kindergartens: non-self-reliant children, sleeping rooms and staff-led evacuation
A kindergarten does not evacuate itself. How a BMI/OAI is set up for childcare — with sleeping rooms, short evacuation times and a drilled protocol as the starting point.
- 065 February 2025
From Bouwbesluit to Bbl — what changes for your fire alarm system under the Dutch Environment Act
With the entry into force of the Omgevingswet in 2024 the Dutch Bouwbesluit 2012 was replaced by the Besluit Bouwwerken Leefomgeving (Bbl). What stays the same for fire alarm systems, what shifts, and what you should watch.
- 0718 January 2025
False alarms in fire detection systems — causes, costs, and how to reduce them
A false alarm is not just disruption; it undermines trust in the system and can delay response to a real fire. The typical causes and how NEN 2535 addresses them.
- 088 January 2025
What does your insurer expect from your fire alarm system dossier?
Insurers assess fire safety increasingly strictly. Which documents they expect, how they assess claims, and how to avoid a liability gap.
Discuss your situation with a specialist
Request a no-obligation intake. We are happy to think along about your installation, certification or maintenance work.
Request an intake call — AMSTERDAM
- info@anixfiresolutions.com
- PHONE
- +31 6 11 64 69 69
+31 6 36 29 64 33 - FOCUS
- BMI · OAI · NEN 2535 / 2654
- SCOPE
- NL · 09 SECTORS